| Mini excavator is used in the construction sites where | | | | Check around the machine if there is damaged |
| contractors and site workers will have easy and | | | | parts that will create problems in the operation. |
| precise operations, low cost, and require small number | | | | Climb up in the machine and sit in the operator's |
| of workers. Using this equipment will make the work | | | | seat and familiarize yourself to the controls, gauges |
| simple for utility projects. Mini excavator is used for | | | | and operator's restraint system. |
| digging, grading, lifting heavy equipments or items, and | | | | Hold the joystick and move them around a little bit. |
| compressing. This comes from different sizes, the | | | | Below your legs are the two steer controls that |
| super compact and the heavy weight. | | | | will enable you to move the machine. It is the push or |
| The following are the basic in operating the machines: | | | | pulls control of the machine. |
| Decide what size of the machine you will be using | | | | At the floor, there were two controls that increase |
| in your project. | | | | the drive force and speed the travel of the machine |
| Confirm the variety of the machine you are renting | | | | from one location to another. |
| and make sure that the customer is allowed to | | | | At your right side, you will find throttle which makes |
| operate the machine. | | | | speed of the engine faster and dozer blade used to |
| Familiarize yourself with the machine by reading | | | | steady the machine. |
| the operator's manual before touching controls. | | | | Start up the engine machine. |
| Observe warning labels, instructions and stickers | | | | Slowly maneuver the machine. |
| that are posted around the machine. | | | | Test the machine by turning and backing. |
| Have the rental business delivered and set up the | | | | Find an area to test out the digging function. |
| machine. | | | | Keep practicing of the control until you feel that |
| When trying the machine, you have to clear the | | | | you are ready for the project operations. |
| area first. | | | | |